• Home
  • Projects
  • What we do
  • Our People
  • Careers
  • Contact Us
  • Project

    Central Multi-Level Logistics Estate

    Industrial

    < Back to Projects

    Presenting ‘Central’, the first large-scale multi-level industrial facility in Sydney’s Central West.

    Lidcombe NSW

    The Lidcombe Last Mile Logistics Facility is an innovatively designed high-spec multi-storey warehouse facility providing 10 individual warehouse and office tenancies.

    Situated on a circa 4 hectare lot and located behind an existing lot with an access handle to the rear lot, the development design comprises of circa 36,000sqm of warehouse and dock area along with circa 4,000sqm of office space, and a 3 level car park for easy access to each tenancy. The warehouse is 24m in height, with floor-to-floor levels of 11.5m and 12.2m for the ground and level 1 respectively.

    Tactical Group’s engagement encompassed the project management of the full project lifecycle commencing with the management of the preparation of the SSDA application, authority applications to Sydney Water, Endeavour energy etc, tender preparation and contractor procurement under a D&C contract, and superintendence of the
    D&C Contract through construction to handover.

     

    Project Snapshot

    Sector: Industrial

    Location: Lidcombe

    Client: Hale Capital

    Size: 38,900sqm GFA

    Value: AUD $120 M

    Status: Current

    Speak with an Expert

    EBRAHIM NATEGHI

    Australia

    EBRAHIM NATEGHI

    PRINCIPAL, AU

    Contact >
    JORDAN REYNOLDS

    New Zealand

    JORDAN REYNOLDS

    DIRECTOR, NZ

    Contact >

    Project Gallery

    Similar Projects

    < Back to Projects

    How can we help you?

    Get in Touch