    Papakura to Pukekohe Electrification

    Infrastructure

    < Back to Projects

    Extending the Auckland Electrified Network from south of Papakura to the southern end of Pukekohe

    Auckland

    The Papakura to Pukekohe (P2P) Electrification Project will extend the Auckland Electrified Network from south of Papakura to the southern end of Pukekohe. This will enable the introduction of electrified rolling stock services and increase the passenger service frequency to 6tph to Pukekohe.

    New stations will be constructed at three locations between Papakura and Pukekohe at Drury Central, Drury West and Paerata. The P2P Project will undertake enabling works for these stations, with construction of the track and elements of civil and platform works to be constructed as part of the CW03 Package. The CW03 package scope of works was tendered as two Contracts relating to different sites along the open route and was split as follows:
     

    • CONTRACT 3A – Drury Central Station (combined service route, formation, formation drainage, Waihoehoe 
    • Retaining Wall) & Glenbrook Spur formation site
    • CONTRACT 3B – Drury West & Paerata Stations (combined service route, formation, formation drainage, large culverts, platforms)


    The same Contractor was the successful tenderer for both Contract 3A and 3B and these will be combined into a single CW03 Contract.

     

    Project Snapshot

    Sector: Infrastructure

    Location: Auckland

    Client: KiwiRail

    Value: NZD $385 m

    Status: Current

    Speak with an Expert

    STEVE RYAN

    Australia

    STEVE RYAN

    DIRECTOR, AU

    Contact >
    JORDAN REYNOLDS

    New Zealand

    JORDAN REYNOLDS

    DIRECTOR, NZ

    Contact >

    Project Gallery

    Similar Projects

    < Back to Projects

    How can we help you?

    Get in Touch